About Gridstor
Portland OR utility-scale battery storage developer/owner (Goldman Sachs Asset Management)
- Type
- Storage developer/IPP
- Size
- ~60 employees
- Roles read from
- gridstor.applytojob.com
- Last read
- Read successfully on 16 Oct 2026
Open roles, day by day
From 10 to 5 since 6 Sep 2026. A gap is a day the careers page could not be read.
Where
Technology
Function
Seniority
Newest roles
The newest of 5 open roles. The apply links are in the digest and the app.
- Director, Large Load InterconnectionPortland, United States · first seen 2 Oct 2026
- Director of Environmental Health & SafetyPortland, United States (+ 2 locations) · first seen 6 Sep 2026
- M&A Analyst/AssociateLos Angeles, United States (+ 1 location) · first seen 6 Sep 2026
- Senior Large Loads Solutions EngineerPortland, United States · first seen 6 Sep 2026
- Director, Technical Accounting and External ReportingPortland, United States · first seen 6 Sep 2026
Get battery storage roles by email — free
The newest battery storage roles, straight from the employers, once a week.
Check your email to confirm battery storage alerts. Nothing will be sent until you click the confirmation link.
Employers like Gridstor
Hiring for the same kind of work.
- Ascend Analytics7 open roles · Battery storage
- REV Renewables6 open roles · Battery storage
- Antora Energy40 open roles · Battery storage
- Energy Vault14 open roles · Battery storage
- Fluence92 open roles · Battery storage
- Base Power154 open roles · Battery storage
Recruiting against Gridstor, or tracking them?
Agency adds the full employer page: how long Gridstor's roles stay open against the market, what they have started and stopped hiring for, reposted and reopened roles, and every open role in a downloadable feed.